Entries by linzhang

181 Fremont Case Study

Designed to be the most resilient tall condominium on the West Coast, 181 Fremont is a model of engineering and orchestration.

Long Beach Civic Center Energy Efficient Skin

Subtle detailing differences emerged on the building envelope, which is composed of unitized facades fabricated and installed by Benson. At City Hall, the facade features solid white panels made from formed aluminum, while units with shadow boxes at the Port building are made from extruded aluminum slats with insulating glass at the face.

DJC Oregon Names Knight Cancer Center Top Project

The Knight Cancer Center Building was designed by SRG Partnership and McCarthy/Andersen Construction Joint Venture served as the General Contractor that facilitated this project completing in 2018, making it eligible as a DJC Top Project.

Portland Building Overclad Nears Completion

Progress continues on the overclad of Michael Graves’ post modern icon The Portland Building. Benson’s Otay Mesa Assembly Facility completed the last of the 946 curtainwall units this week.